Deprecated: mysql_connect(): The mysql extension is deprecated and will be removed in the future: use mysqli or PDO instead in /home/users/olthaftp/ on line 86
Olthaar Ontwerpen |projects|project inclusion in the sahara

project inclusion in the sahara



In a very short timeframe we completed the engineering of the design, the construction and the fittings and a budget for a project undertaking in Libya. By a short term meeting with the involved three parties and opening the project for development, we were able make an offer in a matter of weeks. Because of the often high local temperatures we included under-floor heating and cooling in our plan, and ceiling cooling through the use of active core action.

On location

In order to test our plans we were invited on location in Tripoli and were able to assess the land, culture and project locally. At the same time we also saw the plans and location for the ‘Sea Resort’ development. The full engineering for the project has yet to take place.



process stage

  • engineering

project type

exterieur en interieur bestaande en nieuwbouw

floor area

1.000-5.000 sqm

handing over



  • Bergers Interieurs
  • Royal Haskoning
  • Snelbouw groep