Project 

In a very short timeframe we completed the engineering of the design, the construction and the fittings and a budget for a project undertaking in Libya. By a short term meeting with the involved three parties and opening the project for development, we were able make an offer in a matter of weeks. Because of the often high local temperatures we included under-floor heating and cooling in our plan, and ceiling cooling through the use of active core action.


On location


In order to test our plans we were invited on location in Tripoli and were able to assess the land, culture and project locally. At the same time we also saw the plans and location for the ‘Sea Resort’ development. The full engineering for the project has yet to take place.
 

client

BSI

process stage

  • engineering

project type

exterieur en interieur bestaande en nieuwbouw

floor area

1.000-5.000 sqm

handing over

2009

collaborations

  • Bergers Interieurs
  • Royal Haskoning
  • Snelbouw groep